Highlighted Projects

Modern airport terminal interior with reflective floor and curved ceiling.

New Mexico Firestorm Catastrophe

Pharmaceutical Microbial cleaning

New Mexico Firestorm Catastrophe

Wildfire work in New Mexico. Pairing with the local Albuquerque and Phoenix

offices, The team mobilized in 24hrs from the first call and drove a crew of 30 with three job trailers to the Ruidoso area. The South Fork Fire began on June 17 near Ruidoso and has burned 17,569 acres, destroying at least 1400 houses and structures. HAWKE was tas

Wildfire work in New Mexico. Pairing with the local Albuquerque and Phoenix

offices, The team mobilized in 24hrs from the first call and drove a crew of 30 with three job trailers to the Ruidoso area. The South Fork Fire began on June 17 near Ruidoso and has burned 17,569 acres, destroying at least 1400 houses and structures. HAWKE was tasked to clean three country clubs and several residences from smoke and fire damage.

Silhouette of a construction worker using a tablet at a construction site.

Laboratory Mold cleaning

Pharmaceutical Microbial cleaning

New Mexico Firestorm Catastrophe

The original scope called for a general HVAC cleaning in October. When the county was ready for HAKWE to come on site, mold was found above the ceiling cavity in the laboratory portion of the building as well as incorrectly sealed diffusers. 

All HVAC remediated, as well as a structural and contents HEPA cleaning. All cleaning done to NADC

The original scope called for a general HVAC cleaning in October. When the county was ready for HAKWE to come on site, mold was found above the ceiling cavity in the laboratory portion of the building as well as incorrectly sealed diffusers. 

All HVAC remediated, as well as a structural and contents HEPA cleaning. All cleaning done to NADCA 2021 ACR standard and IICRC S590cleaning for mold remediation.

Engineer using tablet with digital icons in control room.

Pharmaceutical Microbial cleaning

Pharmaceutical Microbial cleaning

Pharmaceutical Microbial cleaning

An emergency services loss, gaskets on chilled water lines leaked into a 500k

sqft space over a course of 3 days. Our team was on campus restoring a smaller mold loss (2 units and supply duct only) when the loss was noted. Approximately 100,000 sqft of space was affected by the

water loss. This client’s new construction building was slated 

An emergency services loss, gaskets on chilled water lines leaked into a 500k

sqft space over a course of 3 days. Our team was on campus restoring a smaller mold loss (2 units and supply duct only) when the loss was noted. Approximately 100,000 sqft of space was affected by the

water loss. This client’s new construction building was slated to open in two weeks. However, due to the amount of moisture that leaked into the space, all HVAC was compromised with microbial contamination. 2,116 access holes were cut into this building and damp wiped with an antimicrobial agent. 

Total loss between all floors was over $3 million for mitigation only.

Past Projects